Site Description
Former industrial site initially developed as an incendiary bomb and metal powder manufacturing company. Post WWII became custom cloth coating operation and various other industrial/commercial operations.
Contaminant/COCs
Chlorinated compounds
Primary Receptor
Potable wells completed in local bedrock acquifier, and indoor air of nearby residences
Trigger Event
Eighteen private wells have been impacted in area surrounding the site. Indoor air contamination in several area residences
Comments
July: Collected round of groundwater samples to determine present distribution of PCE/TCE in bedrock acquifier
August: Perform dual phase extraction tests on existing monitor wells exhibiting highest PCE concentrations to properly size groundwater pumping and soil/bedrock vapor extraction system
September to October: Install bedrock wells for remedial testing
September, Start-up Phase 1: Temporary Remediation System consisting of 300 cfm SVE system connected to 9 Vapor Extraction wells. The off-gas was treated by Vapor Phase Carbon
November, Start-up Phase 2: Temporary Remediation System consisting of 1000 cfm SVE system connected to 18 Vapor Extraction wells. The off-gas is treated by Vapor Phase Carbon
|